ABB FPBA-01 Manuel Page 105

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 134
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 104
Starting up fieldbus communication and programming the ABB PLC (multi-axis system)
105
Starting up fieldbus communication and
programming the ABB PLC (multi-axis systems)
What this chapter contains
This chapter presents the additional steps compared to the ones in the previous
chapter that you must take during the start-up of the drive fieldbus control with ABB
AC500 PLC and PROFIBUS DP adapter module in a multi-axis system. A system
with two drives is set up here.
Equipment and programs
The equipment and programs used in this chapter are the same as in the previous
chapter of this manual. They are listed under Equipment and programs, page 30.
Tool/Step
Setting up the communication
Proceed in the start-up as described earlier in this manual up to page 50.
Vue de la page 104
1 2 ... 100 101 102 103 104 105 106 107 108 109 110 ... 133 134

Commentaires sur ces manuels

Pas de commentaire