ABB FPBA-01 Manuel Page 70

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 134
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 69
Starting up fieldbus communication and programming the ABB PLC (one-drive system)
70
8. In this section a new program row is made before the access_axis1 block. This is
because the state of input switches Off1, Off2 and Off3 must be TRUE before
starting block access_axis1 when the program is run.
Right-click somewhere in the blank area to open the following menu and select
Network (before). -> A new programmable area (program row 0001) is made.
The switches have to go to the TRUE state in the following order: Off2, Off3 and
Off1. They cannot turn on immediately, one after another, so add delay function
blocks (TON) with a delay time of 200 ms.
In case of errors, output ERR_REMOTE has to be evaluated before start. This is
done by block AND with an inverted input. To invert the input, right-click on the input
and select Negate.
Off1_3 is a switch which is later used starting the drive when the program is run. It
is a global variable (Class: VAR_GLOBAL; Type: BOOL).
Tool/Step
Programming the PLC main program
Vue de la page 69
1 2 ... 65 66 67 68 69 70 71 72 73 74 75 ... 133 134

Commentaires sur ces manuels

Pas de commentaire