Starting up fieldbus communication and programming the ABB PLC (multi-axis system)
108
6. Drag and drop CM572-DPM on the green line. In the netConnect-Driver
Parameter dialog box, select 1 for the Board no: box. This is because the CM572-
DP communications module is installed next to the CPU on the left-hand side in the
installation example of this manual.
7. Drag and drop the FPBA-01 DP-V0 two times on the purple line.
Tool/Step
Setting up the communication