ABB RCNA-01 Manuel d'utilisateur Page 39

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 474
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 38
Preparing for installation 35
ACH550-01 User's Manual
Tools required
To install the ACH550 you need the following:
screwdrivers (as appropriate for the mounting hardware
used)
wire stripper
tape measure
•drill
mounting hardware: screws or nuts and bolts, four each. The
type of hardware depends on the mounting surface and the
frame size as follows:
Note: Do not lift frame size R6 without a lifting aid.
Frame
size
Frame
weight
kg
IP21/IP54
Frame
weight
lb
IP21/IP54
Mounting
hardware
Metric
units
Mounting
hardware
Imperial
units
R1 6.5 / 8 14 / 18 M5 #10
R2 9.0 / 11 20 / 24 M5 #10
R3 16 / 17 35 / 37.5 M5 #10
R4 24 / 26 53 / 57 M5 #10
R5 34 / 42 75 / 93 M6 1/4 in
R6 69
1
/ 86
2
152
1
/ 190
2
M8 5/16 in
1
ACH550-01-246A-4, IP21: 70 kg / 154 lb
ACH550-01-290A-4, IP21: 80 kg / 176 lb
2
ACH550-01-246A-4, IP54: 80 kg / 176 lb
ACH550-01-290A-4, IP54: 90 kg / 198 lb
Vue de la page 38
1 2 ... 34 35 36 37 38 39 40 41 42 43 44 ... 473 474

Commentaires sur ces manuels

Pas de commentaire